variables include -
1. time of year - this can dramatically change the turnaround time
2. country of origin - different labs across the mining industry have greatly varying minimum requirements for lab work
3. type of assays being analysed
4. volume of assays being analysed
5. total fee for the batch of assays - also includes fast track fees
6. backlog of assays at time of dispatch
- there's numerous variables which make it too difficult to write off a set of results
- Forums
- ASX - By Stock
- CPO
- Ann: 2024 Energy Transition Metals Summit Presentation
Ann: 2024 Energy Transition Metals Summit Presentation, page-10
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPO (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
-0.002(6.06%) |
Mkt cap ! $6.312M |
Open | High | Low | Value | Volume |
3.2¢ | 3.2¢ | 3.0¢ | $14.60K | 477.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 2013813 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.3¢ | 27000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2013813 | 0.030 |
3 | 140039 | 0.029 |
3 | 242854 | 0.028 |
1 | 18555 | 0.027 |
3 | 418380 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.033 | 27000 | 2 |
0.034 | 200000 | 1 |
0.035 | 15260 | 1 |
0.036 | 75000 | 1 |
0.037 | 205000 | 2 |
Last trade - 15.48pm 11/10/2024 (20 minute delay) ? |
Featured News
CPO (ASX) Chart |