The greatly improved economics are encouraging. Still only at Scoping Study level and so much more work to do. On a Cu production basis only, I calculate an EV to Annual Production value of A$15,253/tonne for the average annual output over the 9.5 years. Once the gold and silver credits are included to give a Cu equivalent figure, this will be lower of course. This value compares with:
HCH at A$21,285/tonne for its Cu Eq value;
XAM at A$22,659/tonne for its Cu only value;
NWC at A$14,164/tonne for its Cu Eq value.
All of the above are at the SS stage of evaluation.
I include the initial capital cost as debt in my calculation of EV.
Another way of assessing value is by NPV (pre-tax) to EV. This is 1.35 for PXX.
- Forums
- ASX - By Stock
- PXX
- Ann: 2024 Scoping Study Alaska Range Copper Gold Project
Ann: 2024 Scoping Study Alaska Range Copper Gold Project, page-7
-
- There are more pages in this discussion • 173 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PXX (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $26.65M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 73076 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 300000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 73076 | 0.013 |
1 | 333333 | 0.012 |
1 | 72727 | 0.011 |
8 | 527098 | 0.010 |
6 | 1091000 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 300000 | 1 |
0.012 | 3500000 | 1 |
0.013 | 2500000 | 2 |
0.014 | 731018 | 4 |
0.015 | 1569634 | 2 |
Last trade - 16.12pm 26/07/2024 (20 minute delay) ? |
Featured News
PXX (ASX) Chart |
Day chart unavailable