Hi
@JedClampert, I have first production at the beginning of 2028.
Scenario assumptions are:
Resource = 170Mt
Ave Grade = 1.26%
Conversion = 75%
Processed Ore = 128Mt
Recovery = 77%
Life of Mine = 20 years
Capex = US $1B total across 2026 and 2027
Opex All-in = US$800 / t
FX = 70c
Post-tax NPV8= US$16B at US$3500 / t average Li price realised.
Good luck, go hard at it is my advice.