Morning all.@samthebatmanI do like this project so don't get me...

  1. 4,687 Posts.
    lightbulb Created with Sketch. 7308
    Morning all.
    @samthebatman
    I do like this project so don't get me wrong.
    This is another case of Smearing and economics.
    Firstly they have drilled down plunge.
    Next we take 224m x 1.5 g/t and we get 336 grams across the whole drill hole.
    If we then subtract the highlight intersections of -
    49.6 x 2 = 99.2 g/t
    20.2 x 2.6 = 55.52 g/t
    12 x 3.7 = 44.4 g/t
    9 x 2.2 = 19.8 g/t
    The sum of the length 90.8m and the total grams is 215.6
    We then take 218.92 from 336 and that leaves us with 117.08 from a total metres drilled of 90.8
    The remaining hole length is 133.2 and the balance of the gold is 117.08.
    That means the grams/ m in the rest of the hole is 0.88g/t and it is down plunge and starts at 269 m down hole.
    They need to build it more from that but this could be the start.


    https://hotcopper.com.au/data/attachments/4583/4583413-eac7fc042afe12db13fd46cdb8930c60.jpg
    Kind regards, Wack.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
8.9¢
Change
-0.001(1.11%)
Mkt cap ! $44.16M
Open High Low Value Volume
8.8¢ 9.1¢ 8.8¢ $24.62K 276.7K

Buyers (Bids)

No. Vol. Price($)
3 89161 8.9¢
 

Sellers (Offers)

Price($) Vol. No.
9.1¢ 65983 2
View Market Depth
Last trade - 15.53pm 11/07/2025 (20 minute delay) ?
AUN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.