HIGHLIGHTS Rosie Project (100% DKM)
• Hole DKDD0029 has intersected 22.35m of mineralisation including 0.45m of
massive sulphides, 3.35m of stringer/heavily disseminated sulphides and
18.55m of disseminated sulphides.
• DKDD0029 was drilled 60m below the deepest drillhole in the south-eastern part of
Rosie, 80m to the east of DKDD0028 and below the current indicated resource.
• Mineralisation remains open at depth.
• Both deep holes are cased with PVC for downhole electromagnetic (DHEM) surveying.
• DHEM survey crew expected to arrive on site in the next 10 days
• The diamond drill program is now complete at the Rosie Nickel Project with all eighteen
drillholes intersecting mineralisation.
• Assays expected in 8 weeks.
- Forums
- ASX - By Stock
- Ann: 22m of Sulphide Mineralisation Intersected below Rosie SthE
HIGHLIGHTS Rosie Project (100% DKM) • Hole DKDD0029 has...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DKM (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.07M |
Open | High | Low | Value | Volume |
12.0¢ | 12.0¢ | 11.5¢ | $4.639K | 40K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 34815 | 12.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 54480 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 34815 | 0.120 |
1 | 75000 | 0.115 |
1 | 250000 | 0.110 |
2 | 100000 | 0.105 |
1 | 150000 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 54480 | 2 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
Last trade - 10.30am 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
DKM (ASX) Chart |