IR1 2.94% 35.0¢ iris metals limited

Ann: 2nd Phase RC Drilling Program Completed at Beecher Project, page-2

  1. 1,293 Posts.
    lightbulb Created with Sketch. 450
    This is going to be mind blowing with widths of up to 80 metres in this second phase ! Bring on the results and to think we have another 7 projects with historical results that we havnt touched yet !
 
watchlist Created with Sketch. Add IR1 (ASX) to my watchlist
(20min delay)
Last
35.0¢
Change
0.010(2.94%)
Mkt cap ! $45.33M
Open High Low Value Volume
34.0¢ 35.0¢ 32.5¢ $89.32K 270.1K

Buyers (Bids)

No. Vol. Price($)
1 30001 32.5¢
 

Sellers (Offers)

Price($) Vol. No.
35.0¢ 22530 2
View Market Depth
Last trade - 16.10pm 14/05/2024 (20 minute delay) ?
Last
34.0¢
  Change
0.010 ( 0.00 %)
Open High Low Volume
34.0¢ 34.0¢ 32.5¢ 18536
Last updated 15.54pm 14/05/2024 ?
IR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.