60,000m drill program !!!
"Blackham has commenced a 60,000m drill programme around the Wiluna Open pits. Blackham currently has 2 RC and 1 diamond rig double shifting with a view to upgrading the Wiluna open pit resources announced over the last two months, to measured and indicated"
"expedite the conversion of the large resource base into reserves
improve and lengthen the mine life
accelerate studies to enhance the Stage 2 expansion economics; and
commit to Stage 2 engineering and long lead items immediately on finalisation of feasibility."
BLK ready to hit the ground running upon completion of expansion study
That is a huge drill program
Bring it on
BLK Price at posting:
83.0¢ Sentiment: Buy Disclosure: Held