SGQ 3.13% 3.3¢ st george mining limited

Hi @kates9999 Had to do this for my own research, happy to...

  1. 1,890 Posts.
    lightbulb Created with Sketch. 3161

    Hi @kates9999

    Had to do this for my own research, happy to share. Cheers


    SGQ Drilling Programme July - Sept 2019

    In a perfect world, here's the best case averages for a rough timeline.

    F= D - 60 mpd & RC - 100 mpd & 6 hr CO.



    R/C - 23 change overs for 2430m = 36days @ 12 hrs

    D - 19 change overs for 2519m = 48 days @ 24 hrs


    Total 42 holes for 4949m as per table.

    Balance 1051m not yet disclosed of the 6000 metres


    50% of the 1051 assigned to each rig = D - 11 days, RC - 7 days, inc change overs.


    Total approx timeline all up - D = 59 days & RC 43 days


    The programme should be finished by the 1st October, all going well, including the extra's.


    Cheers
    Tradealot



    @Averagejoe2013, I'll be waiting a while longer for an entry. Still have lots of numbers to crunch etc. It's only because I take large parcels when I do buy and have to get it right. If it was only 2 or 3 hundred k, waiting wouldn't be an issue

    The programme looks great and will benefit company and shareholders. Talk again soon.
 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.001(3.13%)
Mkt cap ! $35.92M
Open High Low Value Volume
3.2¢ 3.4¢ 3.2¢ $81.29K 2.464M

Buyers (Bids)

No. Vol. Price($)
10 2160923 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 130000 2
View Market Depth
Last trade - 13.54pm 30/08/2024 (20 minute delay) ?
SGQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.