Yeah, but then you've got to wait for the ore sorter to arrive and be installed and commissioned. Hopefully less than two years. Then all the ore will now be triple handled. Once through now, once for the ore sorter and finally for the Alljig. Then you'll find out how close to 50% it really wasn't.
- Forums
- ASX - By Stock
- CDU
- Ann: 50% Cu in blast hole drilling at Las MInerale
Ann: 50% Cu in blast hole drilling at Las MInerale, page-10
-
- There are more pages in this discussion • 69 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)