What I know about drilling you could carve on the edge of an Aspro with a crowbar but, I would think that drilling would be very slow now.
I do not know if the whole pipe has to be withdrawn from the hole in order to add to it to go deeper but, if it does have to be withdrawn, and if they are down 900 m, then that is a bloody lot of pipe to withdraw each time just to add to the depth and, it must take ages to do so.
I would think that the deeper they go the longer we are going to have to wait between news events.
Just the thoughts of a desperado.
Lockitt
- Forums
- ASX - By Stock
- ICG
- Ann: 500M of Sulphide Bearing Porphyry and Breccia in CH-DDH033
Ann: 500M of Sulphide Bearing Porphyry and Breccia in CH-DDH033, page-45
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.242M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $622 | 155.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 92029 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 2345385 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 92029 | 0.004 |
11 | 6137112 | 0.003 |
2 | 2199980 | 0.002 |
3 | 4799950 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 2345385 | 5 |
0.006 | 2412490 | 3 |
0.007 | 1100000 | 1 |
0.008 | 450000 | 2 |
0.009 | 55000 | 1 |
Last trade - 13.43pm 16/08/2024 (20 minute delay) ? |
Featured News
ICG (ASX) Chart |