    I'm running the numbers on the stage one solar project and I'm a little confused.

    Based on the below assumptions, the project is profitable and contributes around 5-10 cents to the share price (I'm setting aside the pumped hydro and other projects until later, this is just for KS1). However, this calculation doesn't include the cost of repaying the $100 million debt facility that was used to finance the construction of KS1. If I include the debt repayment cost the NPV for the project is negative.

    I'm sure my calculations are flawed somehow because if this was actually the case the CEFC and ARENA wouldn't be touching it with a ten foot pole. So can anyone identify which of the below assumptions are wrong?

    1) Annual generation = 145,000 MWh
    2) Guaranteed electricity price ($/MWh) = $88 (up to 2038)
    3) Annual operating costs = $2 million
    4) Annual depreciation costs = $3.8 million (assuming full depreciation of $115 project value over 30 years)
    5) Tax rate = 30%
    6) WACC = 15%
    7) Debt = $100.1 million (repaid by 2023 according to page 49 of 2018 annual report)

    Together these assumptions give me an NPV of -$28 million. Again, this is just KS1 and not the stage two projects. I'm thinking the WACC is too high or the electricity price is too low.

    Cheers
 
watchlist Created with Sketch. Add GNX (ASX) to my watchlist
(20min delay)
Last
27.5¢
Change
0.005(1.85%)
Mkt cap ! $380.9M
Open High Low Value Volume
27.0¢ 27.5¢ 27.0¢ $559.7K 2.055M

Buyers (Bids)

No. Vol. Price($)
28 74160973 27.0¢
 

Sellers (Offers)

Price($) Vol. No.
27.5¢ 10176879 70
View Market Depth
Last trade - 16.10pm 16/07/2024 (20 minute delay) ?
GNX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.