    From my experiences in the construction of process infrastructure, pre-commissioning activities involve the following that enables energisation of the complete systems(s). This being:
    - Structural inspection and certification.
    - Inspection and certification of all pipework welds and flange connections.
    - Electrical inspections of all cables, pumps and equipment, this includes earthing of the entire system.
    - Mark up all changes to drawings.
    - Possible energisation of the main electrical boards.

    I prusume a lot of the equipment has been factorary acceptamce tested and delivered to site to "plug in" but the percommissioning stage takes a lot of time as there are considerable HSE risks (time and cost also) if things go wrong.

    Achiving a "pre-commissioning" stage can be quite vague, if i was managing this i would be calling it as soon as the firest equipment is being fitted and tested.

    For an example, BHP has a 4-stage commissioning process.
    Last edited by B0bthebuild3r: 29/12/22
 
watchlist Created with Sketch. Add 5EA (ASX) to my watchlist
(20min delay)
Last
21.0¢
Change
0.030(16.7%)
Mkt cap ! $70.04M
Open High Low Value Volume
19.0¢ 22.0¢ 19.0¢ $127.7K 619.2K

Buyers (Bids)

No. Vol. Price($)
3 114914 20.5¢
 

Sellers (Offers)

Price($) Vol. No.
21.5¢ 5000 1
View Market Depth
Last trade - 16.10pm 06/05/2024 (20 minute delay) ?
Last
21.0¢
  Change
0.030 ( 13.5 %)
Open High Low Volume
20.5¢ 22.0¢ 20.5¢ 58596
Last updated 15.56pm 06/05/2024 ?
5EA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.