Note that tranche 2 covers about ~65% of the deal and won’t be allotted until after the EGM. The EGM will be well and truly after next assays from the first batch of 250m holes down dip and along strike from 100+ gram x metre hits. Most of the raise won’t hit accounts until the end of next month. There will still be staggers from tranche 1 but limited volume and more easily absorbed. Think of it like a 2 month escrow of over half the raise.
- Forums
- ASX - By Stock
- WTM
- Ann: $5m Placement to accelerate drilling at the Spur Project
Ann: $5m Placement to accelerate drilling at the Spur Project, page-21
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WTM (ASX) to my watchlist
|
|||||
Last
29.0¢ |
Change
0.020(7.41%) |
Mkt cap ! $54.00M |
Open | High | Low | Value | Volume |
26.5¢ | 32.0¢ | 26.0¢ | $475.8K | 1.650M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 51101 | 29.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
28.5¢ | 5380 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 59567 | 0.290 |
2 | 39275 | 0.285 |
1 | 10000 | 0.280 |
2 | 30000 | 0.265 |
5 | 161975 | 0.260 |
Price($) | Vol. | No. |
---|---|---|
0.300 | 18500 | 1 |
0.305 | 8468 | 2 |
0.310 | 50000 | 1 |
0.315 | 38072 | 1 |
0.320 | 99612 | 4 |
Last trade - 15.59pm 06/08/2024 (20 minute delay) ? |
Featured News
WTM (ASX) Chart |