"savings that could not be achieved using competing battery energy storage system (BESS) technologies with an equivalent name plate capacity"
I've been thinking about it, at one point hibernation is mentioned;
I haven't done any of that DYOR on the size of the demand for the project but wonder if spare capacity with the aim of drawing on MWh saved/hibernated capacity from time to time is intended. The other possibility might be that by 2025-26 the X10 is planned to be available with some scale of savings, don't know, might know more on that when the 4 year plan is released.
- Forums
- ASX - By Stock
- RFX
- Ann: 6.6MWh US project recommended for grant funding
Ann: 6.6MWh US project recommended for grant funding, page-13
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.8¢ |
Change
-0.001(1.01%) |
Mkt cap ! $25.9M |
Open | High | Low | Value | Volume |
9.9¢ | 9.9¢ | 9.8¢ | $19.19K | 195.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 85299 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.9¢ | 49619 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 85299 | 0.098 |
3 | 112409 | 0.097 |
2 | 415000 | 0.096 |
2 | 220000 | 0.095 |
1 | 11250 | 0.093 |
Price($) | Vol. | No. |
---|---|---|
0.099 | 49619 | 2 |
0.100 | 197010 | 6 |
0.105 | 39081 | 3 |
0.110 | 335668 | 8 |
0.115 | 216388 | 5 |
Last trade - 15.44pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
9.8¢ |
  |
Change
-0.001 ( 2.00 %) |
|||
Open | High | Low | Volume | ||
10.0¢ | 10.0¢ | 9.8¢ | 58245 | ||
Last updated 15.26pm 17/06/2024 ? |
Featured News
RFX (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online