Drill assays for second hole could be only 1 week away, not a good time to sit on the side lines.
The second hole commentary did state similar mineralization the first hole that hit 63m@10g au.
The second hole in the current drill program, CM23-11a, is nearly completed drilling and intersected over 36
metres of the same rock type withfavourable looking mineralisation that resembles that of CM22-05 and sections
of CM23-08 (see Figure 3). These favourable zones are currently being processed by the laboratory with results
expected in 2-3 weeks time
- Forums
- ASX - By Stock
- DTR
- Ann: 63.2 metres of 10.28g/t Gold at Colosseum Mine
Ann: 63.2 metres of 10.28g/t Gold at Colosseum Mine, page-41
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.47M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $497 | 99.45K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 18105 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 9594426 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 18105 | 0.005 |
13 | 7435335 | 0.004 |
8 | 9350249 | 0.003 |
6 | 8400001 | 0.002 |
4 | 6600001 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 9594426 | 11 |
0.007 | 6537333 | 4 |
0.008 | 2075005 | 3 |
0.009 | 246979 | 2 |
0.010 | 2833334 | 2 |
Last trade - 10.37am 04/10/2024 (20 minute delay) ? |
Featured News
DTR (ASX) Chart |