Drill assays for second hole could be only 1 week away, not a good time to sit on the side lines.
The second hole commentary did state similar mineralization the first hole that hit 63m@10g au.
The second hole in the current drill program, CM23-11a, is nearly completed drilling and intersected over 36
metres of the same rock type withfavourable looking mineralisation that resembles that of CM22-05 and sections
of CM23-08 (see Figure 3). These favourable zones are currently being processed by the laboratory with results
expected in 2-3 weeks time
- Forums
- ASX - By Stock
- DTR
- Ann: 63.2 metres of 10.28g/t Gold at Colosseum Mine
Ann: 63.2 metres of 10.28g/t Gold at Colosseum Mine, page-41
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DTR (ASX) to my watchlist
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.745M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 10619990 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 2745748 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 10619990 | 0.005 |
11 | 10890438 | 0.004 |
2 | 3600000 | 0.003 |
2 | 1700001 | 0.002 |
5 | 18000001 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 2745748 | 3 |
0.007 | 6147364 | 8 |
0.008 | 876145 | 4 |
0.009 | 343979 | 3 |
0.010 | 2000000 | 1 |
Last trade - 16.12pm 26/07/2024 (20 minute delay) ? |
Featured News
DTR (ASX) Chart |
Day chart unavailable