WOW 64% increase in Indicated resource.
The overall tonnage in the ground (ex LGS) has increased from 6.578m mtu to 8.623m mtu. Increase of 2.045m mtu.
We know the BFS (our share is $173m) is based on only 1.155m mtu. On the old resource that equated 1.165/6.578 = 17.5% of the resource (ex LGS). This upgrade in resource changes that to 1.155/8.623 = 13.4% of the resource (ex LGS).
In short, the value of the project is probably 6 to 7.5 times greater than the current BFS (allowing for some discounted cashflow). That means a value of $1bn+ , with more resource coming as the drilling rig is back on site.
There is plenty of upside in this one.
Giddy up!
- Forums
- ASX - By Stock
- EQR
- Ann: 64% Increase of Mt Carbine Indicated Resources (In-Situ)
Ann: 64% Increase of Mt Carbine Indicated Resources (In-Situ), page-2
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EQR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.9¢ |
Change
-0.002(3.92%) |
Mkt cap ! $91.08M |
Open | High | Low | Value | Volume |
5.1¢ | 5.1¢ | 4.9¢ | $77.39K | 1.543M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 620100 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 30360 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 620100 | 0.047 |
2 | 115000 | 0.046 |
1 | 221000 | 0.045 |
1 | 100000 | 0.042 |
1 | 16500 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 30360 | 1 |
0.052 | 13200 | 1 |
0.053 | 863471 | 4 |
0.054 | 1317054 | 3 |
0.055 | 399999 | 1 |
Last trade - 15.06pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
4.9¢ |
  |
Change
-0.002 ( 2.00 %) |
|||
Open | High | Low | Volume | ||
5.1¢ | 5.1¢ | 4.9¢ | 206758 | ||
Last updated 15.06pm 03/05/2024 ? |
Featured News
EQR (ASX) Chart |