Pretty good results and shaping up well.
Of the 17 holes reported to date in this program the average intersection is just over 20m to an average of 142m so on average 120m of overburden over a 250m x 750m area. I haven't added up of the grades yet but can't see too much below 1.5% and a fair few higher grades in there. In terms of MRE for the DSO I think a fair estimate at this stage is plus 10 Mt at above 1.5% CU
Could get much bigger real quick.
- Forums
- ASX - By Stock
- AW1
- Ann: 8% Copper Intersected in Drilling at Storm
Ann: 8% Copper Intersected in Drilling at Storm, page-28
-
- There are more pages in this discussion • 127 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AW1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
-0.005(5.00%) |
Mkt cap ! $49.22M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 9.5¢ | $297.4K | 3.029M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1117408 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.6¢ | 3708 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1117408 | 0.095 |
2 | 63829 | 0.094 |
3 | 1098561 | 0.093 |
6 | 1174788 | 0.092 |
5 | 640648 | 0.091 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 3708 | 1 |
0.097 | 83537 | 1 |
0.099 | 64992 | 1 |
0.100 | 396090 | 1 |
0.105 | 201595 | 5 |
Last trade - 16.10pm 15/10/2024 (20 minute delay) ? |
Featured News
AW1 (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online