DTR 10.0% 0.9¢ dateline resources limited

813,000 ounce Mineral Resource estimate for Colosseum Gold...

  1. 104 Posts.
    lightbulb Created with Sketch. 39
    813,000 ounce Mineral Resource estimate for Colosseum Gold Project

    HIGHLIGHTS

    • Mineral Resource estimate based on 599 drillholes for 55,609 metres, validated by Dateline.
    • 71% of the Mineral Resource is classified as Measured or Indicated.
    • Mineral Resource is open at depth and Company believes that significant potential exists below the Mineral Resource estimate.


    Colosseum mining operation before close down due to a low gold price in 1993
    Last edited by Bogart88: 06/07/22
 
watchlist Created with Sketch. Add DTR (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $13.11M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $33.84K 3.759M

Buyers (Bids)

No. Vol. Price($)
6 2695000 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 650370 2
View Market Depth
Last trade - 15.48pm 14/06/2024 (20 minute delay) ?
Last
0.9¢
  Change
-0.001 ( 0.00 %)
Open High Low Volume
1.0¢ 1.0¢ 0.9¢ 1092311
Last updated 15.52pm 14/06/2024 ?
DTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.