SGC 0.00% 0.4¢ sacgasco limited

Ann: 92 Feet of Gas Pay in Borba 1-7 Well, page-227

  1. 23,007 Posts.
    lightbulb Created with Sketch. 827
    the timing was 25 to 35 days so we can be a week or so away still. Depends also on how long they stop drilling to do casings etc.
    Before end of next week for TD I would think and then they run the wire logs and we all pray
    Then they will most likely either shunt the rig across and drill more holes to get the gas out quickly or they line up another Borba play that GJ has already the seismic on would be my best guess.

    Announcement to ASX 23 February 2021
    Play-Opening Borba 1-7 Natural Gas Well Drilling Ahead • Borba 1-7 well drilled out of 20” Surface-Conductor late Monday 22 February 2021.
    • Currently drilling ahead in 17 ½” hole below a Measured Depth of 262 feet (80 metres).
    • First stage is to drill to around 1,800 feet and set 13 3/8” casing.
    • Borba 1-7 well will be drilled to test multiple stacked 3D seismic anomalies in the interval from 3,200 feet (975 metres) to 9,500 feet (2,800 metres).
 
watchlist Created with Sketch. Add SGC (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $3.587M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $59.70K 14.93M

Buyers (Bids)

No. Vol. Price($)
13 29956613 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 1992623 6
View Market Depth
Last trade - 14.09pm 28/06/2024 (20 minute delay) ?
SGC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.