Hitting some solid grade and length of ore body now.
41M of 0.5% U308 (avg. 5000ppm) inc. 6.4M of 2.0%, is a pretty exciting hit.
Great that we are improving with each new drill program. as seen here below in our first 2 drill programs results.
1. maiden drill program we hit 5.5M of 0.12% U308 (avg. 1200ppm) inc. 0.5M of 0.36%.
2. winter drill program we hit 17M of 0.3% U308 (avg. 3000ppm) inc. 1.0M of 1.06%
It's obvious we are now intersecting some strong thick mineralisation.
- Forums
- ASX - By Stock
- 92E
- Ann: 92E Intersects 41.8m of 0.5% eU3O8 at the GMZ Discovery
Ann: 92E Intersects 41.8m of 0.5% eU3O8 at the GMZ Discovery, page-6
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)