steadily building the resource, ongoing drilling 20 km north of Elan South,
thickness the key here, see pge 6
* Overall Elan HCC Project resources now total 395 Mt
(110Mt Indicated and 285Mt Inferred)
"Holes 38 to 44 have encountered very thick coal seams in the Seam 3 group of seams,
with total cumulative apparent coal thicknesses ranging from 48.4to 104.7 metres.
The geological model that underpins the updated resource estimate incorporates results up to and inclusive of Hole 41.
As such, the more recent results present significant further resource upside potential once the zone of thickening in this area is delineated further.Drilling in the Isolation South area remains ongoing."
gltah
steadily building the resource, ongoing drilling 20 km north of...
Add to My Watchlist
What is My Watchlist?