My understanding is they need to build a 60 mile pipeline for power, water and to transport the lithium slurry for processing. Would not view that as perfect. If you've heard different please let me know. Infrastructure costs can be huge.
- Forums
- ASX - By Stock
- AZL
- Ann: 99.7% LITHIUM CARBONATE PRODUCED FROM BIG SANDY PROJECT
Ann: 99.7% LITHIUM CARBONATE PRODUCED FROM BIG SANDY PROJECT, page-126
-
- There are more pages in this discussion • 85 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZL (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $102.7M |
Open | High | Low | Value | Volume |
2.3¢ | 2.4¢ | 2.3¢ | $325.7K | 13.86M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 2764430 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 376571 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 2764430 | 0.023 |
24 | 5243894 | 0.022 |
31 | 16151237 | 0.021 |
29 | 4301999 | 0.020 |
13 | 1980734 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 376571 | 3 |
0.025 | 4671403 | 29 |
0.026 | 2388955 | 9 |
0.027 | 2282293 | 7 |
0.028 | 1121122 | 11 |
Last trade - 16.10pm 17/05/2024 (20 minute delay) ? |
|
|||||
Last
2.4¢ |
  |
Change
0.000 ( 2.17 %) |
|||
Open | High | Low | Volume | ||
2.3¢ | 2.4¢ | 2.3¢ | 1565891 | ||
Last updated 15.47pm 17/05/2024 ? |
Featured News
AZL (ASX) Chart |