A1G did say they would wait until all assay results were returned before releasing them from the 3km RC drill program at the Didievi Gold Project.
The expected time frame of drilling was two months, back when drilling commenced in late March. If so, drilling should have finished by the end of May.
If drilling did finish on time, it’s been 5 weeks since then, so hopefully we receive an update shortly on the progress of the drill program or receive the assays by the end of July. The end of July is realistic considering laboratory delays being experienced at the moment across the industry.
If RC drill results are consistent with historic intercepts, this stock should run from here.
- Forums
- ASX - By Stock
- A1G
- Ann: A1G COMMENCES MAIDEN DRILLING AT HIGH GRADE DIDIEVI PROJECT
Ann: A1G COMMENCES MAIDEN DRILLING AT HIGH GRADE DIDIEVI PROJECT, page-2
Featured News
Add A1G (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
-0.005(6.02%) |
Mkt cap ! $27.99M |
Open | High | Low | Value | Volume |
8.3¢ | 8.3¢ | 7.6¢ | $171.7K | 2.171M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 231000 | 7.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 51153 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 231000 | 0.076 |
2 | 133000 | 0.075 |
2 | 170000 | 0.072 |
4 | 84286 | 0.070 |
1 | 14000 | 0.068 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 51153 | 2 |
0.082 | 100000 | 1 |
0.084 | 100000 | 1 |
0.089 | 15000 | 1 |
0.090 | 222504 | 1 |
Last trade - 15.58pm 06/11/2024 (20 minute delay) ? |
Featured News
A1G (ASX) Chart |