A4 Dome Discovery Continues to Deliver Exciting Results
• Nine holes at A4 Dome to date have intersected significant copper mineralisation
• Latest assay results and logging of drill core confirms several wide intersections
• Two types of mineralisation occur including high-grade veins and NPF contact
• Only 1km of the 5km long interpreted structural target zones tested to date
• A4 Dome located just 8km from T3 Project including planned 3Mtpa process plant
• Five drill rigs now on site with more to commence drilling within days
- Forums
- ASX - By Stock
- MOD
- Ann: A4 Dome Discovery Continues to Deliver Exciting Results
Ann: A4 Dome Discovery Continues to Deliver Exciting Results, page-3
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)