Back of envelope calculation using 50 Tonne dump truck load at 10 trips per day x 6 days a week for 38 usable weeks allowing for rainy season gives 114,000 Tonnes p.a.
Say each truck can average 2.5 trips per 12 hour day will take 4 trucks plus 2 trucks in reserve
using 14 grams / tonne we would approach 50,00 oz/year giving about $70 million p.a. turnover.
Clearly the trick will be to haul enough ore in the dry season so that processing can continue through the wet.
The equation has lots of variables, but looks to be logical and viable with plenty of upside if the logistics of moving ore can be improved.
The benefits of reopening the Coyote mine are obviously appealing now given that the treatment costs will be hugely reduced.
All in all the deal looks like a winning move.
- Forums
- ASX - By Stock
- Ann: ABM Secures Coyote Plant for Treatment of Old Pirate Ore
-
- There are more pages in this discussion • 68 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.001(50.0%) |
Mkt cap ! $9.525M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.2¢ | $683 | 341.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
28 | 53568696 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 87756881 | 46 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
24 | 51318696 | 0.002 |
64 | 153553502 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 87206881 | 45 |
0.004 | 15952006 | 15 |
0.005 | 2867123 | 4 |
0.006 | 2600001 | 4 |
0.007 | 1717000 | 3 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
PRX (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online