I posted this on 27/06/2018:
Time Line:
1) 2H 2018 - DFS to be ready
2) Air permit - required for construction - to be lodged in the next few weeks (takes few months to get approved)
3) Water permit - required for production - to lodged by Q4 2018 (takes few months to 18mths worse case scenario to get approved)
4) All ready to proceed with construction by Mid CY2019
Now water permit is crossed out of the list