MC very cheap for a company about to start construction of a mine of this standard. Im baffled as to why they hid the 45m Cu intercept at the back of the announcement. It may be game changing and the market hasn't realised it yet. I suppose they want those assays before the spruik it too much. Some photos of the core would have been nice.
- Forums
- ASX - By Stock
- Ann: Abra Base Metals Project Drilling Results
MC very cheap for a company about to start construction of a...
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable