you are a geologist, you didn't build any ug mines.
i am not saying that the box cut is fake and your securities fraud conclusion is a childish slippery slope fallacy, you are clearly butthurt from being called out about your lack of mining expertise. i have driven a car for 30 years, it doesn't make me a mechanic.
all I'm saying is that this box cut is unnecessarily limited, for no real cost saving or purpose especially in the long term. im an advocate of do it once, do it right as mobilisation, rehandling etc are all fixed.
why have a narrow box cut, that still has batters at the start? let alone cutting a portal in weathered material?
why is the mincor box cut wider, especially when it is shallower??? that boxcut does have the room to hold a fan.
im just sick of Muppets in the mining industry doing things wrong or half arsed and then costing more. just do things right at the beginning.
- Forums
- ASX - By Stock
- G1A
- Ann: Abra Box-Cut Complete - Project Update
Ann: Abra Box-Cut Complete - Project Update, page-28
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online