Perhaps all my pain n suffering is about to slowly ( yes slowly) be rewarded. Sitting at 25 per cent above my buy in price now.. only achieved through dangerous averaging down.. BUT i am here for bags!! Still if i bought in the 30's i would l still be mighty peeved.. but their time will come soon enough.
- Forums
- ASX - By Stock
- G1A
- Ann: Abra Construction 58% Complete
Ann: Abra Construction 58% Complete, page-20
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online