"We have first rate contractors, and so I think it's time for one of the partial share price upward rerates.'
They sure do take pride in their concrete formwork , the smoothness and fitment shown in figure 5 of the fine ore bin under pass would be higher in quality of workmanship than most high end concrete homes would have for internal walls .
The foundations for the Ball mill looks massive
Kudos to RedDog for getting the completion % correct .
- Forums
- ASX - By Stock
- G1A
- Ann: Abra Construction 58% Complete
Ann: Abra Construction 58% Complete, page-4
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable