So is its projection approx 95k tonnes pa of lead x $1USD sale per lb x 2200 ( convert to tonnes) = $209m
Production costs of 0.44USD per lb x 2200 = per tonne = $968 per tonne x 95ktpa = 92m
+ silver approx 20m pa - Production costs ? = 8m ebidta
ebitda of approx $125m per year USD
- Forums
- ASX - By Stock
- Ann: Abra Construction 58% Complete
So is its projection approx 95k tonnes pa of lead x $1USD sale...
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable