Abra's got a 6MW solar system with a 2MW battery, its gas turbine is a 10MW turbine. Gas will be LNG trucked into site however it should be getting considerably more than 10% of its power from solar.
KOTH has a 30MW turbine and 2 MW solar / battery setup with the gas being piped into site.
Gas in WA is around $5 - $6 per GJ compared with $22 - $30 on the east coast.
- Forums
- ASX - By Stock
- Ann: Abra Construction 92% Complete - First Ore Underground
Abra's got a 6MW solar system with a 2MW battery, its gas...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable