G1A 0.00% 5.9¢ galena mining limited

Abra's got a 6MW solar system with a 2MW battery, its gas...

  1. 120 Posts.
    lightbulb Created with Sketch. 34
    Abra's got a 6MW solar system with a 2MW battery, its gas turbine is a 10MW turbine. Gas will be LNG trucked into site however it should be getting considerably more than 10% of its power from solar.

    KOTH has a 30MW turbine and 2 MW solar / battery setup with the gas being piped into site.

    Gas in WA is around $5 - $6 per GJ compared with $22 - $30 on the east coast.
 
watchlist Created with Sketch. Add G1A (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.