G1A 0.00% 5.9¢ galena mining limited

Ann: Abra Construction 97% Complete - First Ore Stockpiled, page-14

  1. 1,691 Posts.
    lightbulb Created with Sketch. 296
    Lead price currently sitting about 11% above mine assumptions. Lead stockpile levels also about lowest they have been.
 
watchlist Created with Sketch. Add G1A (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.