Very low valuation is unsustainable
- Trades at 0.42x P/NPV on our prices and 0.29x at spot
- FCF yields of 30% at our price deck or 46-51% at spot
- Net cash will exceed current EV by 2027 or 2026 at spot
So, whats not to love - lead ain't sexy, but this stock will rerate, and after debt repaid, become an institutional dividend stock ?
- Copper zone remains largely untested (but not for long)
Current SP movements have been on low volume - volume confirms price, and it will be fascinating to see what price long suffering SH's start to cough up their shares .... I'm a holder till after full commissioning, and will probably hold till after the FY'23 report is issued.
Analyst SP target remains 44c, so 30c target is reasonable ?
Happy Xmas all, especially Rendog.
- Forums
- ASX - By Stock
- Ann: Abra Construction 97% Complete - First Ore Stockpiled
Very low valuation is unsustainableTrades at 0.42x P/NPV on our...
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable