TIE 0.00% 67.5¢ tietto minerals limited

Ann: Abujar Gold Project May Construction Update, page-26

  1. 995 Posts.
    lightbulb Created with Sketch. 74
    I just don't understand who would be selling such large volume at this stage in the game? surely we are actually at the sp lows now and it's up up and away from here now?
 
watchlist Created with Sketch. Add TIE (ASX) to my watchlist
(20min delay)
Last
67.5¢
Change
0.000(0.00%)
Mkt cap ! $773.8M
Open High Low Value Volume
67.5¢ 68.0¢ 67.0¢ $2.410M 3.577M

Buyers (Bids)

No. Vol. Price($)
1 102301 67.5¢
 

Sellers (Offers)

Price($) Vol. No.
68.0¢ 7601051 48
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
67.5¢
  Change
0.000 ( 0.75 %)
Open High Low Volume
67.5¢ 67.5¢ 67.0¢ 194439
Last updated 15.59pm 24/05/2024 ?
TIE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.