TIE 0.74% 68.0¢ tietto minerals limited

Ann: Abujar Gold Project May Construction Update, page-26

  1. 991 Posts.
    lightbulb Created with Sketch. 74
    I just don't understand who would be selling such large volume at this stage in the game? surely we are actually at the sp lows now and it's up up and away from here now?
 
watchlist Created with Sketch. Add TIE (ASX) to my watchlist
(20min delay)
Last
68.0¢
Change
0.005(0.74%)
Mkt cap ! $776.2M
Open High Low Value Volume
67.5¢ 68.0¢ 67.0¢ $1.945M 2.878M

Buyers (Bids)

No. Vol. Price($)
4 496660 67.5¢
 

Sellers (Offers)

Price($) Vol. No.
68.0¢ 13490117 94
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
67.8¢
  Change
0.005 ( 0.03 %)
Open High Low Volume
67.5¢ 68.0¢ 67.5¢ 488540
Last updated 15.58pm 10/05/2024 ?
TIE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.