TIE 0.00% 67.5¢ tietto minerals limited

Ann: Abujar Gold Project October Construction Update, page-18

  1. 2,145 Posts.
    lightbulb Created with Sketch. 315
    The build teams on these projects are not shown in vast numbers in the photos which leads me think careful planning is managing this whole operation what is shown and what is done make me wonder if Caigen plays chess
    Tietto are still drilling
    Gold is open at depth and along strike
    Buy the dips because they won't last
    Next stop 72c
 
watchlist Created with Sketch. Add TIE (ASX) to my watchlist
(20min delay)
Last
67.5¢
Change
0.000(0.00%)
Mkt cap ! $773.8M
Open High Low Value Volume
67.5¢ 68.0¢ 67.3¢ $806.0K 1.193M

Buyers (Bids)

No. Vol. Price($)
3 2819240 67.5¢
 

Sellers (Offers)

Price($) Vol. No.
68.0¢ 4838791 52
View Market Depth
Last trade - 16.10pm 29/05/2024 (20 minute delay) ?
Last
67.5¢
  Change
0.000 ( 0.37 %)
Open High Low Volume
67.3¢ 67.5¢ 67.3¢ 61663
Last updated 15.53pm 29/05/2024 ?
TIE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.