THB 4.55% 2.3¢ thunderbird resources limited

Ann: Acquisition of Advanced Copper-Silver Project in Peru, page-12

  1. 2,949 Posts.
    lightbulb Created with Sketch. 713

    Below is from the Silver Standard website.

    • 2010 Scoping study: A scoping study for a mining-milling operation at Berenguela was prepared in 2010. The study proposes the recovery of silver by conventional cyanide leaching followed by the Merrill-Crowe process, the recovery of copper by direct electro-winning and cementation, and the recovery of manganese dioxide by electro-winning. Two mining scenarios were evaluated, one based on a 4,000 tonnes per day operation and another at 1,000 tonnes per day.

    I think some of the answers will be in the 2010 Scoping Study report, but it seems this was a second tier project for Silver Standard, probably because of profitability compared to other projects they had ongoing.

    I also saw that they paid around $8M for the project as I skimmed through the filings.

    If I can find the Scoping report I will share, but so far no luck.
 
watchlist Created with Sketch. Add THB (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.001(4.55%)
Mkt cap ! $7.407M
Open High Low Value Volume
2.2¢ 2.3¢ 2.2¢ $3.288K 148.4K

Buyers (Bids)

No. Vol. Price($)
2 82213 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 78310 3
View Market Depth
Last trade - 10.43am 06/09/2024 (20 minute delay) ?
THB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.