Below is from the Silver Standard website.
- 2010 Scoping study: A scoping study for a mining-milling operation at Berenguela was prepared in 2010. The study proposes the recovery of silver by conventional cyanide leaching followed by the Merrill-Crowe process, the recovery of copper by direct electro-winning and cementation, and the recovery of manganese dioxide by electro-winning. Two mining scenarios were evaluated, one based on a 4,000 tonnes per day operation and another at 1,000 tonnes per day.
I think some of the answers will be in the 2010 Scoping Study report, but it seems this was a second tier project for Silver Standard, probably because of profitability compared to other projects they had ongoing.
I also saw that they paid around $8M for the project as I skimmed through the filings.
If I can find the Scoping report I will share, but so far no luck.
- Forums
- ASX - By Stock
- Ann: Acquisition of Advanced Copper-Silver Project in Peru
Below is from the Silver Standard website. 2010 Scoping study: A...
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add THB (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
0.001(5.26%) |
Mkt cap ! $6.486M |
Open | High | Low | Value | Volume |
2.1¢ | 2.7¢ | 1.9¢ | $564.1K | 25.26M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 784505 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 104729 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 784505 | 0.020 |
4 | 857779 | 0.019 |
3 | 67610 | 0.018 |
8 | 504062 | 0.017 |
4 | 1648000 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 104729 | 2 |
0.022 | 570902 | 4 |
0.023 | 1373800 | 4 |
0.024 | 650000 | 1 |
0.026 | 1010000 | 2 |
Last trade - 16.10pm 13/11/2024 (20 minute delay) ? |
Featured News
THB (ASX) Chart |