@Archieros ... "clearly stated that the tailings dam won't be an issue"
Please quote from the report itself where it stated that, include page number so everyone can go and check for themselves.
Here is what I found on pg 15
" REQUEST FOR DOCUMENTATION FROM THIRD PARTIES
2 HIRING A COMPANY SPECIALIZED IN GEOTECHNICS
3 EVALUATION OF THE DOCUMENTATION OBTAINED
4 FIELD INSPECTION
5 PREPARATION OF SPECIFICATIONS FOR COMPLEMENTARY SERVICES
6 CONTRACTING AND EXECUTING TOPOGRAPHIC SURVEY
7 CONTRACTING AND EXECUTING RESEARCH FIELD AND LABORATORY TESTS
8 HYDROLOGICAL STUDIES -HYDRAULIC
9 PREPARATION OF THE HYDROGEOLOGICAL MODEL FOR LOWERING THE MINE AND GROUNDWATER MONITORING PLAN
10 CARRYING OUT STABILITY ANALYSIS AND PREPARATION OF THE FINAL OPINION ON THE SAFETY CONDITIONS OF THE ENTERPRISE
11 STUDY FOR THE DISPOSAL OF STERIL
12 CONTRACTING THE REVIEW OF THE MINING PLAN
"REVIEW OF THE MINING PLAN Based on the investigations,
tests and stability analyzes carried out, the mining plan must
be reviewed by a specialized company in order to guarantee
the viability of the existing project and thus define possible changes
to adapt to the desired assumptions and imposed in the
geological-geotechnical studies of safety and stability of the
B4 Dam structure and pit slope."
https://sei.anm.gov.br/sei/modulos/...aDEb654u77rx-SwNigFzEtWck4fDe6_nd6Vru16OQMNA2
Now where does the report state there is no issue and how can any report state 'something' is not an issue until all the research work has been done??
- Forums
- ASX - By Stock
- Ann: ACQUISITION OF HIGH-GRADE ARAXA NIOBIUM PROJECT
@Archieros ... "clearly stated that the tailings dam won't be an...
-
- There are more pages in this discussion • 111 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $31.56M |
Open | High | Low | Value | Volume |
2.9¢ | 2.9¢ | 2.9¢ | $26.86K | 926.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 685327 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 582257 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 685327 | 0.029 |
6 | 762297 | 0.028 |
5 | 1960740 | 0.027 |
10 | 15906036 | 0.026 |
9 | 14861430 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 582257 | 5 |
0.031 | 809827 | 4 |
0.032 | 411780 | 3 |
0.033 | 687656 | 6 |
0.034 | 149428 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online