@2gg .... I think your boundaries of the tenements are a bit incorrect. The little dogleg at the South of the West tenement, runs along the front of the tailings dam wall, the big one on the right..
This above photo thanks @Paul88 shows it better.
Part of the resource is under this large tailings dam wall, as stated in the PEA. On Pg 27 of the PEA are a group of photos, including the tailings dam and drilling between the large dam and the small one.
The inferred resource, including a lot of the higher grade mineralisation starts about 130 metres to the East of the foot of the tailings dam wall. Pg 29.
https://itafos.com/site/assets/files/1773/itafos-araxa_technical_report_final-.pdf
- Forums
- ASX - By Stock
- SGQ
- Ann: ACQUISITION OF HIGH-GRADE ARAXA NIOBIUM PROJECT
Ann: ACQUISITION OF HIGH-GRADE ARAXA NIOBIUM PROJECT, page-97
-
- There are more pages in this discussion • 173 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
-0.002(7.41%) |
Mkt cap ! $27.21M |
Open | High | Low | Value | Volume |
2.7¢ | 2.8¢ | 2.5¢ | $545.6K | 20.79M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1967331 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 1141000 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1967331 | 0.025 |
5 | 13115000 | 0.024 |
4 | 5771864 | 0.023 |
3 | 1770000 | 0.022 |
2 | 240000 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 1141000 | 5 |
0.027 | 1450615 | 3 |
0.028 | 635714 | 2 |
0.029 | 487314 | 2 |
0.030 | 766000 | 3 |
Last trade - 16.10pm 14/10/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, Managing Director & CEO
Charles Armstrong
Managing Director & CEO
SPONSORED BY The Market Online