ENV enova mining limited

Ann: ACQUISITION OF POTENTIAL WORLD CLASS IONIC CLAY REE PROJECT, page-44

  1. 7,117 Posts.
    lightbulb Created with Sketch. 672
    Hello. No. No. No. No. No. Drilling deeper will unlikely increase the current 1,768ppm near surface average grade to 4,500ppm. Most of the ENV holes are already drilled to 10 metres. Based on VMM drilling, the increase in grade from surface auger drilling to deeper RC/DD drilling is around 12%. These are clay deposits. The grade will increase by around 12% at various depths until they hit transitional rock. Once the transitional rock is hit it becomes uneconomic because only the clay is economic.
    Last edited by GKeden: 26/02/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.8¢
Change
0.001(14.3%)
Mkt cap ! $11.66M
Open High Low Value Volume
0.8¢ 0.8¢ 0.7¢ $9.044K 1.196M

Buyers (Bids)

No. Vol. Price($)
27 43288969 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 13094469 15
View Market Depth
Last trade - 16.10pm 25/06/2025 (20 minute delay) ?
ENV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.