KRM kingsrose mining limited

Ann: Acquisition of Rana Nickel-Copper-Cobalt Project Norway, page-57

  1. 2,945 Posts.
    lightbulb Created with Sketch. 2627
    Not only do our projects penikat and porsanger have Cu as biproducts to the PGE's, the new Rana project has an offset structure adjacent to the previous Bruvann mine workings thats never been followed up!

    All amongst an area that produces massive sulphides (effectively the crem de la crem of prospective deposits)

    From the acquisition announcement:

    "Mineralisation at the past producing Bruvann Mine is open immediately along strike from mine workings and is adjacent to a >1km long, undrilled conductive body which may represent massive sulphide mineralisation. Offset styles of copper-rich mineralisation south of the mine are inferred from historical drill data in hole P-11-97 and have never been followed up: ▪ 15.1 metres at 1.89% Cu from 148.6 metres, including 8.7 metres @ 2.35% Cu from 155.0 metres"
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.2¢
Change
0.000(0.00%)
Mkt cap ! $24.11M
Open High Low Value Volume
3.3¢ 3.3¢ 3.1¢ $19.09K 605.4K

Buyers (Bids)

No. Vol. Price($)
2 198540 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 371607 2
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
KRM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.