so the UK plant needs to be operational to provide data required to get the ACT plant approved. If UK ask for the same data, where too then? I thought the NSW pilot plant may have provided some of this data..? wasn't this operational for a period of time?
- Forums
- ASX - By Stock
- Ann: ACT Project and International Update
so the UK plant needs to be operational to provide data required...
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)