Lachlan in a * interview said that once the machine was in deep enough to support itself off the roof on the decline which is the way it is designed to operate in achieved 3m in a shift.
If it operates two shifts a day it could achieve six or get up to name plate of 7 m so about 70 or 80 days to go.
I liked to hear talk about
*bringing additional work areas within the permitted mining lease into the early stages of mining at Kanmantoo;
*Reducing unit operating costs with additional annual throughput through utilising the latent capacity in the processing facility, which only operates for approximately 40% of the time under the Stage 1 plan; and
*Assessing the optimal cut off grade to also better utilise the existing mill capacity.
- Forums
- ASX - By Stock
- HGO
- Ann: Activity Report for Quarter Ended 31 December 2021
Ann: Activity Report for Quarter Ended 31 December 2021, page-5
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.4¢ |
Change
0.001(1.59%) |
Mkt cap ! $134.1M |
Open | High | Low | Value | Volume |
6.4¢ | 6.4¢ | 6.1¢ | $114.1K | 1.820M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 199989 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 425332 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 199989 | 0.062 |
3 | 580136 | 0.061 |
6 | 227106 | 0.060 |
3 | 315000 | 0.059 |
3 | 362000 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.064 | 425332 | 2 |
0.065 | 598913 | 3 |
0.066 | 30000 | 1 |
0.067 | 14940 | 1 |
0.068 | 732700 | 5 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
HGO (ASX) Chart |