>Re MAY's Zapato-1/ST wells.......they got their drill string stuck in the hole and ended up backing off the string and leaving a fish in the hole. They then cemented back and sidetracked the well. While this would classed as a remedial sidetrack the root reason is different from the reason for the Mukuyu-1 sidetrack.
Worth noting that there have been plenty of major discoveries after stuck string, casing tools etc that neccessitated sidetracks. Zapato's failure had nothing to do with needing to sidetrack. They never found/misinterpreted the predicted reservoir.
If the reservoir doesn't exist you can drill it perfectly 100 times without sidetracks and it's still not going to be there.
- Forums
- ASX - By Stock
- Ann: Additional Elevated Gas Shows in Primary Target
>Re MAY's Zapato-1/ST wells.......they got their drill string...
-
-
- There are more pages in this discussion • 309 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $94.99M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.6¢ | $77.45K | 1.145M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 151496 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 2500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 151708 | 0.067 |
5 | 253496 | 0.066 |
5 | 893384 | 0.065 |
2 | 130999 | 0.064 |
5 | 653900 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.067 | 168 | 1 |
0.069 | 121225 | 2 |
0.070 | 474981 | 4 |
0.071 | 370417 | 2 |
0.072 | 550000 | 2 |
Last trade - 15.57pm 11/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |