"i thought they would set a plug on a pill, tag and carry on."
Plugs would be run using a cementing string...ie no drilling jewelry. Plugs would be pumped and the string pulled back a bit and theyd wait on cement before running back in with the cementing string and tagging top of plug to confirm depth of same.
Cementing can be performed through a full drilling assembly but only in an emergency situation such as where you have uncontrollable losses. Pumping cement and coarse LCM through MWD tools and motors is never a good idea. Occasionally I've seen operators use a PBL sub above the BHA which allows pumping of cement and LCM into the wellbore without going through the BHA....but PBL subs from my experience have a habit of failing and costing you a trip out of the hole.
- Forums
- ASX - By Stock
- IVZ
- Ann: Additional Elevated Gas Shows in Primary Target
Ann: Additional Elevated Gas Shows in Primary Target, page-555
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.1¢ |
Change
-0.001(1.61%) |
Mkt cap ! $92.50M |
Open | High | Low | Value | Volume |
6.2¢ | 6.3¢ | 6.1¢ | $43.07K | 696.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 241119 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.2¢ | 89913 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 241119 | 0.061 |
6 | 414118 | 0.060 |
5 | 241949 | 0.059 |
6 | 316058 | 0.058 |
2 | 333157 | 0.057 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 89913 | 3 |
0.063 | 100000 | 1 |
0.064 | 70000 | 1 |
0.065 | 111248 | 2 |
0.066 | 15000 | 1 |
Last trade - 15.50pm 19/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |