"With regards to the flow testing. They drill out the remaining LA in 6" but will the part that is undrilled be flowed from? Or will it be too complex due to the high pressure?"
They'll drill the 6" hole, log it and then test that section. They'll then plug back the open hole and conduct further testing after perforating the 7" liner.
- Forums
- ASX - By Stock
- Ann: Additional gas discovery in Lower Angwa Mukuyu-2
"With regards to the flow testing. They drill out the remaining...
-
- There are more pages in this discussion • 239 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.9¢ |
Change
-0.001(1.43%) |
Mkt cap ! $97.83M |
Open | High | Low | Value | Volume |
7.0¢ | 7.0¢ | 6.8¢ | $86.34K | 1.252M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 17171 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 90004 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 17171 | 0.069 |
4 | 502182 | 0.068 |
4 | 891462 | 0.067 |
8 | 524307 | 0.066 |
8 | 416008 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 90004 | 2 |
0.071 | 154999 | 1 |
0.072 | 218454 | 5 |
0.073 | 150000 | 1 |
0.074 | 203000 | 3 |
Last trade - 16.10pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
7.0¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
6.8¢ | 7.0¢ | 6.8¢ | 666820 | ||
Last updated 15.26pm 16/05/2024 ? |
Featured News
IVZ (ASX) Chart |