CBE 7.94% 6.8¢ cobre limited

Ann: Additional Significant Copper Intersection at Ngami Project, page-34

  1. 1,275 Posts.
    lightbulb Created with Sketch. 153
    The infill drilling will drill 500 metres to the open side of the furthest apart drill holes, so potentially the infill drilling will add another 1km to the strike zone.
 
watchlist Created with Sketch. Add CBE (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
0.005(7.94%)
Mkt cap ! $25.03M
Open High Low Value Volume
6.8¢ 6.8¢ 6.8¢ $4.379K 64.40K

Buyers (Bids)

No. Vol. Price($)
1 100000 6.5¢
 

Sellers (Offers)

Price($) Vol. No.
6.8¢ 60800 2
View Market Depth
Last trade - 10.51am 13/09/2024 (20 minute delay) ?
CBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.